Turnkey Apartment and House Finishing
Turnkey finishing process
The turnkey finishing process begins with planning and preparation. At this stage, the scope of work is determined, materials are selected, and a phased schedule is developed. Next, the rough work is completed: leveling walls and floors, installing utilities, electrical installation, and plumbing. After this, the final finishing work beginsβinstalling flooring, tiling, finishing walls, and installing doors, baseboards, and decorative elements.


Advantages of turnkey finishing
Comprehensive finishing avoids discrepancies between stages of work, as all processes are carried out using a single technology and under the supervision of a single team of specialists. This is especially important when renovating private homes, where it’s necessary to consider building settlement, the specifics of the floors, and utility systems.
Our Benefits
one contractor at all stages of work
strict adherence to technology and sequence
agreed deadlines for repairs
budget optimization without unnecessary expenses
Turnkey Apartment and House Finishing FAQ
The standard scope of work includes all types of rough and finishing work: surface leveling, electrical installation, plumbing, tiling and flooring, wall finishing, door installation, and finishing elements. The exact scope of work is determined on a case-by-case basis.
Yes, changes are possible, but they must be agreed upon in advance and may impact the timeframe and cost of the work. A professional company always informs the client of the consequences of such changes.
The timeframe depends on the size of the property, the complexity of the project, and the scope of work. On average, finishing an apartment takes 1.5 to 3 months, while finishing a private home takes longer, taking into account engineering and design features.